PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Layout for the interior framing at the 3rd floor.(800x600).jpg Overhead conduit at the 1st floor going into the Electrical Room 284 Facing South (800x600).jpg Split wire at the 2nd floor Facing East (800x600).jpg Started building scaffold at Stair -4 Facing East (800x600).jpg Installing split wire at the 1st floor Facing South  (800x600).jpg
Previous page Installing split wire at the 1st floor Facing South  (800x600)
Installing split wire at the 1st floor Facing South (800x600)